Shirt hanger mold Mold Size 550x450mm / advice choose 250Ton injection machine Mold cavity 2 cavities Mold Steel 2344 steel, the original hardness is HRC33 degree Mold steel treatment way At final arranged hardness treatment for the core and cavity plates to HRC45 degree by vacuum quenching treatment Mold gate way Hot runner Mold uselife 800000 shots Mold cycle time 30 sec 1st. Test mold time 50 days after confirmed mold drawing files Mold doff way ejectors Package PET film covered then packing into standard wooden case -If this shirt hanger mould easy get flash or not? Not easy, as we make all ejectors holes by slow wire line cutting always. And PS material always not easy get flash. -If this shirt hanger mould can work full automatic or not? Yes, sure. Must 100% work full automatic but need fix metal hook by robot. -If this shirt hanger mould can designed much more cavities? Yes, can be. but on normal designed 2 cavities as need fix metal hook by robot, if too much cavities not easy control. If need more information about this mould, pls contact with us. tks! Process Mold steelP20, 718, 2738, 2344, 2316, S136, 3Cr13, 38CrMoAl, Mov and more Mold cavity1 or more (depend on client) Surface treatmentselectroplate (in order to prevent rust), thur. nitrogen (in order to rise surface hardness), vacuum quenching (in order to rise whole hardness) Plastic materialsPP, PVC, PPR, ABS, PA, PC, POM, PS, PET, HDPE, LDPE and other SoftwareUG, PRO-E, MOLDFLOW, CAD, CAE, VISI Mold gate waycold runner/hot runner/semi-hot runner Mold baseHASCO, DME, LKM, HOME-MADE Mold doff systemejectors, off-plate, air valves, hydraulic jars, air jars, air ejectors, oil-motor and more Mold coolingWater cooling/air cooling/beryllium bronze cooling Mold payment50% down payment by T/T, 50% balance by T/T before shipment Mold shipmentBy sea/air/train Mold packagingpacked into standard wooden cases Mold quotationmost reasonable as rich experience Technology 1) Mould structure design Professional designers provide you with reasonably designed mould to shorten cycle hours. Reducing unnecessary procedure improves efficiency. 2) Mould cooling system According to the structural characteristics of the product and the appearance of the product , We design a reasonable form of gate for mould, such as a large gate, hidden gate, fan gate, needle gate, pin point gate etc., a reasonable channel of runner design make mold temperature balance in the shortest time to improve mould precision and productivity. 3) Accessory for mould Slide, guide pin, guide sleeve, lifter blocks and so on are taken by wear-resistant standard parts, to ensure the mould life. 4) Deal with mould Quenching the mold, heat treatment to improve the hardness, then Nitriding temperature is lower , the mold will no longer need to quench mold with high surface hardness and wear resistance more than HV850 Service 1) We can repair the mould in one year for some free and provide technology. . 2) Gurantee period is 12months starting from the date of moulds accept in the Buyer’s factory. 3) If the moulds happen the big problem, The moulds cannot repaired, the Buyer cannot solve the problems,eg, mould crack, product can’t moulding…any big problem(except the human error) due to the mould life can’t reach to guranteed shots.the Seller and Buyer's negotiate to slove the problem, the buyer can send it back to the factory to repair or If serious, the Seller have resposiblity to make new mould for the Buyer.pp coat hanger mold suppliers website:http://www.oskaimold.com/hanger-molds/pp-hanger-mold/